HomeMy WebLinkAboutIntermountain Gas 210120 Boise Construction i
Idaho PUC Pipeline Safet �� In pection Summary
Inspector(s): Ulmer LIE Date(s): 20-1an-21
Company/Owner: Intermountain Gas Unit/OPID: 8160
Inspection Type &Time (1 day, 0.5 day) I Total Inspection Days: 1
Standard:FI Construction: Training: F_� (T)(D)Integrity Management: F7 Incident:
M/M: F7 Follow-up: Oct: Damage Prevention: D&A:
Inspection Summary
A construction inspection was performed on Das-Co, a contractor for Intermountain Gas Company
20 January 2021: (1 Construction)
Observed a Das-co crew installing new 3/4" service line at 2806 Kathryn St, Boise, Idaho. All procedures were
followed.
Areas observed during this project were: line locating, keyholing, horizontal directional drilling, pipe
installation, tracer wire installation, stab fitting, pressure testing and verified OQ's.
Attachments:
IPUC Form 1 Inspection Summary
IPUC Form 4 Construction Inspections
Das-co daily itineraries
Corrective Action Required: Yes Nol X
Follow-up Required: (date): Yes Nol X
Inspector (Lead): JDate:
Reviewer: Date: