Loading...
HomeMy WebLinkAboutIntermountain Gas 210120 Boise Construction i Idaho PUC Pipeline Safet �� In pection Summary Inspector(s): Ulmer LIE Date(s): 20-1an-21 Company/Owner: Intermountain Gas Unit/OPID: 8160 Inspection Type &Time (1 day, 0.5 day) I Total Inspection Days: 1 Standard:FI Construction: Training: F_� (T)(D)Integrity Management: F7 Incident: M/M: F7 Follow-up: Oct: Damage Prevention: D&A: Inspection Summary A construction inspection was performed on Das-Co, a contractor for Intermountain Gas Company 20 January 2021: (1 Construction) Observed a Das-co crew installing new 3/4" service line at 2806 Kathryn St, Boise, Idaho. All procedures were followed. Areas observed during this project were: line locating, keyholing, horizontal directional drilling, pipe installation, tracer wire installation, stab fitting, pressure testing and verified OQ's. Attachments: IPUC Form 1 Inspection Summary IPUC Form 4 Construction Inspections Das-co daily itineraries Corrective Action Required: Yes Nol X Follow-up Required: (date): Yes Nol X Inspector (Lead): JDate: Reviewer: Date: IPUC Form 1