HomeMy WebLinkAboutIntermountain Gas 210112 Boise Construction Inspection Summary Idaho PUC Pipeline " f Inspector(s): Ulmer/Brooks Date(s): T 12-Jan-21 Company/Owner: Intermountain Gas Unit/OPID: 8160 Inspection Type &Time (1 day, 0.5 day) Total Inspection Days:1 2 Standard: Construction: 2 Training: (T)(D) Integrity Management: Incident: M/M: Follow-up: OQ: Damage Prevention: D&A: Inspection Summary A construction inspection was performed on Das-Co, a contractor for Intermountain Gas Company 11 January 2021 (2 construction) Observed a Das-co crew installing new main along Lake Hazel and continuing along Orchard in Boise, Idaho. All procedures were followed. Areas observed during this project were: traffic control, back filling and clean up. Attachments: IPUC Form 4 Construction Inspections Das-co daily itineraries located in file for the project. Corrective Action Required: Yes No X Follow-up Required: by(date): p, Yes No X Inspector (Lead): 4 Date: 44�� ja7w Reviewer: Date: IPUC Form 1