HomeMy WebLinkAboutIntermountain Gas 210112 Boise Construction Inspection Summary
Idaho PUC Pipeline " f
Inspector(s): Ulmer/Brooks Date(s): T 12-Jan-21
Company/Owner: Intermountain Gas Unit/OPID: 8160
Inspection Type &Time (1 day, 0.5 day) Total Inspection Days:1 2
Standard: Construction: 2 Training: (T)(D) Integrity Management: Incident:
M/M: Follow-up: OQ: Damage Prevention: D&A:
Inspection Summary
A construction inspection was performed on Das-Co, a contractor for Intermountain Gas Company
11 January 2021 (2 construction)
Observed a Das-co crew installing new main along Lake Hazel and continuing along Orchard in Boise, Idaho. All
procedures were followed.
Areas observed during this project were: traffic control, back filling and clean up.
Attachments:
IPUC Form 4 Construction Inspections
Das-co daily itineraries located in file for the project.
Corrective Action Required: Yes No X
Follow-up Required: by(date): p, Yes No X
Inspector (Lead): 4
Date:
44�� ja7w
Reviewer: Date:
IPUC Form 1