HomeMy WebLinkAboutIntermountain Gas 210105 Eagle Construction Idaho PUC Pipeline Safety Inspection Summary
Inspector(s): Perkins/Brooks Date(s): 5-Jan-21
Company/Owner: Intermountain Gas Unit/OPID: 1 8160
Inspection Type&Time (1 day, 0.5 day) I Total Inspection Days: 2
Standard:F—I Construction:F2 Training: F__� (T)(D)Integrity Management: E:1 Incident: EJ
M/M: 1-1 Follow-up: F7 Oct: F-1 Damage Prevention: D&A: E]
Inspection Summary
A construction inspection was performed on Das-Co, a contractor for Intermountain Gas Company
5 Jan 2021 (2.0) construction)
Observed a Das-co crew installing new 3/4" service lines at 18451 N Collin Quarry and 18274 Burnt Car Way,
Eagle, Idaho.All procedures were followed.Typed up report.
Areas observed during this project were: line locating,trenching, installing risers, continental fittings,
bedding/backfill, pressure testing and verified OQ's
Attachments:
IPUC Form 4 Construction Inspections
Das-co daily iteneraries located in file for the project.
OQ's for all observed employees are located in file for the project.
Pictures of job ticket.
Corrective Action Required: Yes No X
Follow-up Required: by(date): Yes No X
Inspector(Lead): Date:
Bruce Perkins 5-Jan-21
Reviewer: I Date:
Dar in Ulmer Lf .lave fir'
IPUC Form 1