Loading...
HomeMy WebLinkAboutIntermountain Gas 210105 Eagle Construction Idaho PUC Pipeline Safety Inspection Summary Inspector(s): Perkins/Brooks Date(s): 5-Jan-21 Company/Owner: Intermountain Gas Unit/OPID: 1 8160 Inspection Type&Time (1 day, 0.5 day) I Total Inspection Days: 2 Standard:F—I Construction:F2 Training: F__� (T)(D)Integrity Management: E:1 Incident: EJ M/M: 1-1 Follow-up: F7 Oct: F-1 Damage Prevention: D&A: E] Inspection Summary A construction inspection was performed on Das-Co, a contractor for Intermountain Gas Company 5 Jan 2021 (2.0) construction) Observed a Das-co crew installing new 3/4" service lines at 18451 N Collin Quarry and 18274 Burnt Car Way, Eagle, Idaho.All procedures were followed.Typed up report. Areas observed during this project were: line locating,trenching, installing risers, continental fittings, bedding/backfill, pressure testing and verified OQ's Attachments: IPUC Form 4 Construction Inspections Das-co daily iteneraries located in file for the project. OQ's for all observed employees are located in file for the project. Pictures of job ticket. Corrective Action Required: Yes No X Follow-up Required: by(date): Yes No X Inspector(Lead): Date: Bruce Perkins 5-Jan-21 Reviewer: I Date: Dar in Ulmer Lf .lave fir' IPUC Form 1