HomeMy WebLinkAboutIntermountain Gas 210105 Caldwell Construction Idaho PUC Pipeline Safety Inspection Summary Inspector(s): I Ulmer Date(s): 5-1an-21 Company/Owner: Intermountain Gas Company Unit/OPID: 1 8160 Inspection Type &Time (1 day) I Total Inspection Days:1 1 Standard:FI Construction:FI Training: F—] (T)(D) Integrity Management: =1 Incident: M/M: 71 Follow-up: Oct: Damage Prevention: D&A: Inspection Summary A construction inspection was performed on Das-co, a contractor for Intermountain Gas Company. 5 Jan 2021: (1.0 Construction) Observed a Das-co crew installing new 6" Steel (over 17,000 ft) and 4" PE (over 22,000 ft) Mains from S. 101n Ave east along Orchard Ave to Middleton Rd and multiple cross streets in Caldwell, Idaho. All procedures were followed. Areas observed during this project were: Excavating, Pipe handling, welding, plastic joining,tracer wire installation, cad-welding,test post installation, reg station installation, bedding/backfilling. Attachments: IPUC Form 4 Construction Inspections Das-co daily Itineraries located in file for the project. OQ's for all observed employees are located in file for the project. Dates: Aug: 24, 25, 26, 27 Sept: 21, 22, 23, 28, 29, 30 Oct: 13, 14, 15, 26, 27, 28, 29 Nov: 16, 17, 18, 24, 25 Dec: 9, 10 Jan 5, Corrective Action Required: Follow-up Required: Yes No X Yes No X by(date): Inspector (Lead): '_�#U_ �D -Date: S' Reviewer: I Date: IPUC Form 1