HomeMy WebLinkAboutAvista 210621-24 Kellogg Field Construction Idaho PUC Pipeline Safety Inspection Summary Inspector(s): Perkins/Ulmer/Brooks I Date(s): JJune 21-24, 2021 Company/Owner: Avista Utilities Unit/OPID: I Kellogg/31232 Inspection Type &Time (1 day, 0.5 day) Total Inspection Days:1 12 Standard: 11 Construction:= Training: (T)(D)Integrity Management: Incident: M/M: = Follow-up: OQ: Damage Prevention: D&A: Inspection Summary Audit consisted of inspecting field installed operating equipment for the Avista's Kellogg,Idaho inspection unit.Records and procedures for all Idaho Avista units were inspected March 16-17,2021 virtually from our office in Boise,Idaho. June 21,2021: (3 Standard travel) Traveled to Coeur d'Alene, ID to conduct inspection. June 22-23 2021: (5 Standard) (1 OQ) Met with Avista company representatives in the Kellogg, Idaho district office for in-brief and began field audit of Kellogg installed equipment. Regulator Stations 230,235,240,242,244,248,249,252,260270,273,274,275,276 and 278, were randomly selected and inspected for relief operation, regulator lock-up and general condition of the station including pipe-to-soil wrap and corrosion. Seven cathodic rectifiers,twenty valves, six carrier-to-casings and three patrols were inspected for the Kellogg district with four defects noted(Reg Sta#235 and 260 worker failed lock-up and 270 monitor failed lock-up also Patrol at Terror Gulch-Expansion joint possible out of range deflection and pipe is lifting off the rollers). IPUC Form 3 was conducted with Randy Bareither. June 24,2021: (3 Standard) Traveled back to Boise, ID. Wrote the inspection report, completed audit forms: PHMSA IA question set, IPUC Forms 1, 3 and attached inspection documents. Attached: PHMSA Form 2, IA Equivalent,Field Portion(Not attached) IPUC Form 1, Inspection Summary IPUC Form 3, Exit Interview IPUC Field equipment Work sheets Corrective Action Required: Yes X No Follow-up Required: by(dat ): 23 June 2022 Yes X No Inspector (Lead): ��% Date: Perkins 2 Reviewer: Date: IPUC Form 1