HomeMy WebLinkAboutAvista 210511-12 Moscow Field Construction Idaho PUC Pipeline Safety Inspection Summary Inspector(s): I Ulmer I Date(s): May 11-12,2021 Company/Owner: Avista Utilities Unit/OPID: I Moscow/31232 Inspection Type &Time (1 day, 0.5 day) Total Inspection Days: 5 Standard: 4.5 Construction: Training: (T)(D) Integrity Management: Incident: OQ: 0.5 Damage Prevention: D&A: M/M: = Follow-up: Inspection summary Audit consisted of inspecting field installed operating equipment for the Avista Lewiston,Idaho inspection unit.Records and procedures for all Idaho Avista units were inspected March 16-17,2021 virtually from our office in Boise,Idaho. May 10,2021: (1 Standard travel) Traveled to Moscow, ID to conduct inspection. May 11-12, 2021: (1.5 Standard, .5 OQ) Met with Avista company representatives in the Pullman, Washington district office for in-brief and began field audit of Moscow installed equipment. Regulator Stations 306, 312, 318, 322, 323, 324, 327, 337, 380, 382, 383, 384, 387, 3090 and 3111 were randomly selected and inspected for relief operation,regulator lock-up and general condition of the station including pipe-to-soil wrap and corrosion. Three cathodic rectifiers,nine valves and four carrier-to-casings were inspected for the Moscow district with one defect noted(Sta 323 relief failed reset). IPUC Form 3 was conducted with Randy Bareither. May 13,2021: (1 Standard travel) Traveled back to Boise, ID. May 14,2021: (1 Standard post) Wrote the inspection report, completed all forms and attached inspection documents. Attached: PHMSA Form 2, IA Equivalent, Field Portion(Not attached) PHMSA Form 15, OQ Field IPUC Form 1, Inspection Summary IPUC Form 3, Exit Interview IPUC Field equipment Work sheets Corrective Action Required: Yes No X Follow-up Required: Vyfdate n. Yes No X Inspector(Lead): Date: 1U49.AA4 7A-- I a wit' Qv7 Reviewer: 41 Date: IPUC Form 1