Loading...
HomeMy WebLinkAboutAvista 210216-17 CRM Construction Idaho PUC Pipeline Safety Inspection Summary Inspector(s): Perkins/Ulmer/Brooks Date(s): See below 11, 16-17 and 24 Feb 2021 Company/Owner: Avista Unit/OPID: CRM/31232 Inspection Type &Time (1 day, 0.5 day) Total Inspection Days: 8 Standard:F8 Construction: Training: a (T)(D) Integrity Management: Incident: M/M: = Follow-up: OQ: Damage Prevention: D&A: Inspection Summary 2021 Control Room Avista Utilities 11 February 2021: (1 Standard prep) Prepared for Avista Utilities Control Room inspection through review of PHMSA IA question set and 2017 inspection results. 16-17 February 2021: (6 Standard) Bruce Perkins, Darrin Ulmer, and Jeff Brooks completed a joint (Washington UTC and Oregon PUC) virtual/teleconference audit of Avista's Control Room records, procedures and operations. The PHMSA IA question set was used as a guide throughout the audit to ensure all areas were completed/covered. Areas of Concern:See attached Post-Visit Verbal Briefing 24 February 2021: (1 Standard post ) Completed forms and typed report Attached: PHMSA Operator Qualification Inspection (IA version) 8154 Avista HQ Control Room Management IPUC Form 1, Inspection Summary IPUC Form 3, Exit Interview Operator Document Records are located in: 1:\Pipeline\Inspections\2021\Avista CRM Corrective Action Required: Yes No X Follow-up Required: by(date): Yes No X Inspector (Lead): Date: Perkins /' �— 24-Feb-21 Reviewer: Date: IPUC Form 1