HomeMy WebLinkAboutAvista 210518-20 Lewiston Construction Idaho PUC Pipeline Safety Inspection Summary
Inspector(s): Perkins/Brooks Date(s): 18-20 May 21
Company/Owner: Avista Unit/OPID: 31232
Inspection Type&Time (1 day, 0.5 day) Total Inspection Days: 6.5
Standard:F--] Construction: 6.5 Training: F7 (T)(D)Integrity Management: a Incident:
M/M: = Follow-up: OQ: Damage Prevention: D&A:
Inspection Summary
A construction inspection was performed on an Avista Utilities Crew
18-20 May 2021 (6.0) Construction/Travel
Observed a Avista Utilites Crew relocating a 2" main and at 1610 15th Ave in Lewiston Idaho to accommodate a
sewer project being completed by the city of Lewiston and traveled back to Boise
Areas observed during this project were: Line locating,pressure testing, bedding/backfilling,purging, welding,
abandoning old line, coating install, repair of line gouge and bypass line construction.
24 May 2021 (.5)
Completed forms and typed reports
Attachments:
IPUC Form 4 Construction Inspection
OQ's for all observed employees and located in the file for the project
Pictures of As-builts and Locate ticket
Corrective Action Required: Yes No X
Follow-up Required: by(date): Yes No X
Inspector(Lead): Date:
Perkins =-�� ?, �� w 24-May-21
Reviewer: v Date:
Ulmer 7 �