Loading...
HomeMy WebLinkAboutAvista 210518-20 Lewiston Construction Idaho PUC Pipeline Safety Inspection Summary Inspector(s): Perkins/Brooks Date(s): 18-20 May 21 Company/Owner: Avista Unit/OPID: 31232 Inspection Type&Time (1 day, 0.5 day) Total Inspection Days: 6.5 Standard:F--] Construction: 6.5 Training: F7 (T)(D)Integrity Management: a Incident: M/M: = Follow-up: OQ: Damage Prevention: D&A: Inspection Summary A construction inspection was performed on an Avista Utilities Crew 18-20 May 2021 (6.0) Construction/Travel Observed a Avista Utilites Crew relocating a 2" main and at 1610 15th Ave in Lewiston Idaho to accommodate a sewer project being completed by the city of Lewiston and traveled back to Boise Areas observed during this project were: Line locating,pressure testing, bedding/backfilling,purging, welding, abandoning old line, coating install, repair of line gouge and bypass line construction. 24 May 2021 (.5) Completed forms and typed reports Attachments: IPUC Form 4 Construction Inspection OQ's for all observed employees and located in the file for the project Pictures of As-builts and Locate ticket Corrective Action Required: Yes No X Follow-up Required: by(date): Yes No X Inspector(Lead): Date: Perkins =-�� ?, �� w 24-May-21 Reviewer: v Date: Ulmer 7 � IPUC Form 1