Loading...
HomeMy WebLinkAboutAvista 210517 Lewiston Construction Idaho PUC Pipeline Safety Inspection Summary Inspector(s): I Perkins, Brooks I Date(s): 17-May-21 Company/Owner: Avista Utilities Unit/OPID: 31232 Inspection Type &Time (1 day, 0.5 day) I Total Inspection Days: 2.5 Standard: Construction: 2.5 Training: (T)(D) Integrity Management: Incident: M/M: Follow-up: OQ: Damage Prevention: D&A: Inspection Summary A construction inspection was performed on Curry, a contractor for Avista Utilities. 17 May 2021 (2.0) construction) Observed a Curry crew installing a new 3/" PE service line at 7355 Red Pheasant, Lewiston, ID. All procedures were followed. Areas observed during this project were: Pipe handling, service line installation, pipe squeezing, tracer wire installation, compression fitting installation, EFV installation, meter installation, pressure testing, bedding and 24 May 2021 (.5) construction) Reports and forms produced for inspection activities. Attachments: IPUC Form 4 Construction Inspections Gauge Photo Dig Ticket OQ Documents for Curry employees Corrective Action Required: Yes No X Follow-up Required: by (date): Yes No X inspector (Lead): Date: Perkins � �� �? 24-May-21 Reviewer: �' Date: ­2 IPUC Form 1