Loading...
HomeMy WebLinkAboutNorthwest Gas Processing 220521-22 Procedures Idaho PUC Pipeline Safety Inspection Summary Inspector(s): I Perkins, Brooks, Galli I Date(s): 31 May, 21-22 Jun 22 Company/Owner: I Northwest Gas Processing Unit/OPID: 139370 Inspection Type &Time (1 day, 0.5 day) I Total Inspection Days: 6.0 Standard: ❑6 Construction: ❑ Training: (T)(D)Integrity Management: Incident: Gas Rule: Follow-up: ❑ OQ: Damage Prevention: D&A: Inspection Summary Audit consisted of inspecting Northwest Gas Processing Operation and Maintenance Manual Procedures 2022, Public Awareness Program-2022, Emergency Response Plan-2022 and SOPS. This audit was performed in Boise, Idaho at the IPUC office Garnet room. May 31,2022 (1 Standard Prep) Prepared for the Procedural Audit of Northwest Gas Processing. Reviewed operators Operation and Maintenance (O&M)Manual, IA Question sets and past inspections. June 21-22,2022 (4.5 Standard) Met with Northwest Gas Processing contracted representative to audit the companies procedures in the O&M Manual. Following the audit an IA exit interview was conducted with Hope Shelton, Shelton Consulting. No discrepancies were found. June 22,2022 (.5 Standard Post) Completed IPUC Form 1 for final review and filing Attached: IA Exit Interview Corrective Action Required: Yes No X Follow-up Required: by,(date):,_, Yes No X Inspector (Lead): ,,' ;',.,� Date: Bruce Perkins " 6/22/2022 Reviewer: Date: Jeff Brooks 6/22/2022 IPUC Form 1