Loading...
HomeMy WebLinkAboutIntermountain Gas 221207 Boise Construction Idaho PUC Pipeline Safety Inspection Summary Inspectors):I Brooks Date(s): 7-Dec-22 Company/Owner: Intermountain Gas Company(IGC) Unit#/OPID 8160 Inspection Type & Time (1 day, 0.5 day) I Total Inspection Days:11 Standard: Construction: Training: (T)(D)Integrity Management: Incident: Gas Rule: Follow-up: OQ: Damage Prevention: D&A: Inspection Summary A construction inspection was performed on Das-Co, a contractor for Intermountain Gas Company. 7 December 2022 (1.0) construction,typed reports IPUC inspector observed contractors (Das-Co) install a new 3/4" PE service line at 823 E Nature View Ct, in Boise, ID. Observations included excavation,tracer wire,plastic butt fusing, stab fitting, meter placement, pressure test, EFV installation, line squeezing, line purging, gas testing, and backfilling. All procedures were followed in accordance with IGCs Operations and Maintenance Manual. Attachments IPUC Form 4 Construction Inspections Daily itenerary located in file for the project. OQ's for all observed employees are located in file for the project. Corrective Action Required: Yes No X Follow-up Required: by(date): Yes No X Inspector (Lead): Date: 12/7/2022 Brooks Reviewer: Date: IPUC Form 1