Loading...
HomeMy WebLinkAboutIntermountain Gas 221109 Nampa Construction Idaho PUC Pipeline Safety Inspection Summary Inspectors): JBrooks I Date(s): 9-Nov-22 Company/Owner: lIntermountain Gas Company(IGC) Unit#/OPID 18160 Inspection Type &Time (1 day, 0.5 day) I Total Inspection Days:11 StandardT—1 Construction: � Training: F7 (T)(D)Integrity Management: Incident: Gas Rule: = Follow-up: OQ: Damage Prevention: D&A: Inspection Summary A construction inspection was performed on Das-Co, a contractor for Intermountain Gas Company. 9 November 2022 (1.0) construction,typed reports IPUC inspector observed contractors (Das-Co) install a new 3/4" PE service line at 518 S Rosa Parks Way in Nampa, ID. Observations included line locating, excavation,tracer wire,plastic butt fusions, stab fittings,meter placement, pressure test, EFV installation, line squeezing, line purging, and backfilling. All procedures were followed in accordance with IGCs Operations and Maintenance Manual. Attachments: IPUC Form 4 Construction Inspections Daily itenerary located in file for the project. OQ's for all observed employees are located in file for the project. Corrective Action Required: Yes No X Follow-up Required: by(date): Yes No X Inspector(Lead): Date: 11/9/2022 Brooks Reviewer: Date: IPUC Form 1