HomeMy WebLinkAboutIntermountain Gas 221109 Boise Construction Idaho PUC Pipeline Safety Inspection Summary
Inspector(s): JPerkins, Galli 11 Date(s): 9-Nov-22
Company/Owner: I Intermountain Gas Company(IGC) Unit#/OPID 18160
Inspection Type &Time (1 day, 0.5 day) I Total Inspection Days:11
Standard:FI Construction: FTI Training: F7 (T)(D) Integrity Management: El Incident: El
Gas Rule: F-1 Follow-up: F-1 OQ: F7 Damage Prevention: El D&A:
Inspection Summary
A construction inspection was performed on a Intermountain Gas Company(IGC) Crew.
09 Nov 2022 (1.0) construction,typed reports
IPUC inspectors observed an IGC crew repair a leaking service line(Aldy-A tee/cap)to a house at 3838
Pepperwood Drive in Boise, ID. Leak survey crew had identified the leak and was onsite to confirm location
with applicable tools. Observations included OQ verification, line locating,trenching, electro fusion, safety
equipment. All procedures were followed in accordance with IGCs O&M Manual.
Attachments:
IPUC Form 4 Construction Inspections
Daily itenerary located in file for the project.
OQ's for all observed employees are located in file for the project.
Corrective Action Required: Yes No X
Follow-up Required: by(date): Yes No X
Inspector Peek ds: Date: 11/9/2022