Loading...
HomeMy WebLinkAboutIntermountain Gas 221103 Nampa Construction Idaho PUC Pipeline Safety Inspection Summary Inspector(s): JBrooks I Date(s): 3-Nov-22 Company/Owner: Intermountain Gas Company (IGC) I Unit#/OPID 18160 Inspection Type &Time (1 day, 0.5 day) Total Inspection Days:11 Standard:FI Construction:a1 Training: (T)(D) Integrity Management: Incident: Gas Rule: = Follow-up: Oct: Damage Prevention: D&A: Inspection Summary A construction inspection was performed on Das-Co, a contractor for Intermountain Gas Company. 3 November 2022 (1.0) construction,typed reports IPUC inspectors observed contractors(Das-Co) install new 3/4" PE service lines at 3828 and 3850 S Pelican Ridge Ave in Nampa, ID. Observations included line locating, excavation, tracer wire,plastic butt fusions, stab fittings,meter placement, pressure test, EFV installations, line squeezing, line purging, and backfilling. Das-Co employee was quizzed on applicable AOCs for fusion and squeeze off procedures. All procedures were followed in accordance with IGCs Operations and Maintenance Manual. Attachments: IPUC Form 4 Construction Inspections Daily itenerary located in file for the project. OQ's for all observed employees are located in file for the project. Corrective Action Required: Yes No X Follow-up Required: by(date): Yes No X Inspector (Lead): 14 Date: Brooks 11/3/2022 Reviewer: Date: IPUC Form 1