Loading...
HomeMy WebLinkAboutIntermountain Gas 221102 Boise Construction Idaho PUC Pipeline Safety Inspection Summary Inspectors): I Perkins, Galli I Date(s): 11/2-3/2022 Company/Owner: I Intermountain Gas Company(IGC) Unit#/OPID 18160 Inspection Type &Time (1 day, 0.5 day) I Total Inspection Days:14 Standard:F--] Construction: F4 Training: F7 (T)(D) Integrity Management: Incident: Gas Rule: = Follow-up: OQ: Damage Prevention: D&A: Inspection Summary A construction inspection was performed on Das-Co, a contractor for Intermountain Gas Company. 02 &03 Nov 2022 (4.0) construction,typed reports IPUC inspectors observed contractors(Das-Co) install new 3/4" PE service line from a 2" steel main to a business at 2251 S Empire Way in Boise, ID. Observations included OQ verification,trenching, line locating, tracer wire, boring,thumper boring and safety equipment to include shore box installation. All procedures were followed in accordance with IGCs O&M Manual. Attachments: IPUC Form 4 Construction Inspections Daily itenerary located in file for the project. OQ's for all observed employees are located in file for the project. Corrective Action Required: Yes No X Follow-up Required: by(date): Yes No X Inspector(Lead): ' Date: 11/3/2022 Perkins Reviewer: Date: 11/3/2022 Brooks - IPUC Form 1