Loading...
HomeMy WebLinkAboutIntermountain Gas 221027 Meridian Construction Idaho PUC Pipeline Safety Inspection Summary Inspector(s): I Brooks, Galli I Date(s): 27-Oct-22 Company/Owner: Intermountain Gas Company (IGC) Unit#/OPID 18160 Inspection Type &Time (1 day, 0.5 day) Total Inspection Days: 2 Standard: Construction: 2 I Training: F_� (T)(D) Integrity Management: Incident: Gas Rule: Follow-up: OQ: Damage Prevention: D&A: Inspection Summary A construction inspection was performed on Das-Co, a contractor for Intermountain Gas Company. 27 October 2022 (2.0) construction,typed reports IPUC inspectors observed contractors(Das-Co) install new 3/4" PE service lines to a house at 3638 & 3654 W Silver Lane in Meridian, ID. Observations included OQ verification, line locating,trenching,tracer wire,plastic butt fusions, successful pressure test at 90 psi for 15 minutes, EFV 1200 installations, line squeezing, stab fittings bedding and backfilling. Das-Co employee was quizzed on applicable AOCs for fusion and squeeze off procedures. All procedures were followed in accordance with IGCs Operations and Maintenance Manual. Attachments IPUC Form 4 Construction Inspections Daily itenerary located in file for the project. OQ's for all observed employees are located in file for the project. Corrective Action Required: Yes No X Follow-up Required: by(date): Yes No X Inspector (Lead): Date: 10/27/2022 Brooks Reviewer: Date: 10/27/2022 Galli IPUC Form 1