Inspectors): JPerkins I Date(s): 26-Oct-22
Company/Owner: Intermountain Gas Company(IGC) Unit#/OPID 18160
Inspection Type &Time (1 day, 0.5 day) I Total Inspection Days:11
Standard:F1 Construction:FTI Training: F—] (T)(D) Integrity Management: E] Incident:
Gas Rule: F1 Follow-up: F-1 oct: 71 Damage Prevention: 1:1 D&A: El
Inspection Summary
A construction inspection was performed on Das-co a contractor for Intermountain Gas Company.
26 October 2022 (1.0) construction,typed reports
IPUC inspector observed a Das-co crew installing a 2"plastic main line extension for a new residence in Star,ID
at 9775 W Millcreek Ln. Observations included line and sleeve locating, safety equipment,verification of OQs,
and trenching. All procedures were followed in accordance with IGCs Operations and Maintenance Manual.
Attachments:
IPUC Form 4 Construction Inspections
Daily itenerary located in file for the project.
OQ's for all observed employees are located in file for the project.
Corrective Action Required: Yes No X
Follow-up Required: by(date): , Yes No X
Inspector (Lead): ' Date:
Perkins -„> �'' 10/26/2022
;.y
Reviewer: Date: 10/26/2022
Brooks � --