Loading...
HomeMy WebLinkAboutIntermountain Gas 221026 Star 2 Construction Idaho PUC Pipeline Safety Inspection Summary Inspectors): JPerkins I Date(s): 26-Oct-22 Company/Owner: Intermountain Gas Company(IGC) Unit#/OPID 18160 Inspection Type &Time (1 day, 0.5 day) I Total Inspection Days:11 Standard:F1 Construction:FTI Training: F—] (T)(D) Integrity Management: E] Incident: Gas Rule: F1 Follow-up: F-1 oct: 71 Damage Prevention: 1:1 D&A: El Inspection Summary A construction inspection was performed on Das-co a contractor for Intermountain Gas Company. 26 October 2022 (1.0) construction,typed reports IPUC inspector observed a Das-co crew installing a 2"plastic main line extension for a new residence in Star,ID at 9775 W Millcreek Ln. Observations included line and sleeve locating, safety equipment,verification of OQs, and trenching. All procedures were followed in accordance with IGCs Operations and Maintenance Manual. Attachments: IPUC Form 4 Construction Inspections Daily itenerary located in file for the project. OQ's for all observed employees are located in file for the project. Corrective Action Required: Yes No X Follow-up Required: by(date): , Yes No X Inspector (Lead): ' Date: Perkins -„> �'' 10/26/2022 ;.y Reviewer: Date: 10/26/2022 Brooks � -- IPUC Form 1