HomeMy WebLinkAboutIntermountain Gas 221026 Star 1 Construction Idaho PUC Pipeline Safety Inspection Summary
Inspectors): I Brooks, Galli 11 Date(s): 26-Oct-22
Company/Owner: I Intermountain Gas Company(IGC) Unit#/OPID 18160
Inspection Type &Time (1 day, 0.5 day) Total Inspection Days: 2
Standard:FI Construction:F2 Training: (T)(D)Integrity Management: Incident:
Gas Rule: F] Follow-up: Oct: Damage Prevention: D&A:
Inspection Summary
A construction inspection was performed on Probst Electric -Gas Division a contractor for Intermountain Gas
Company.
26 October 2022 (2.0) construction,typed reports
IPUC inspectors observed a Probst Electric crew install a plastic main line at new subdivision Cranefield in Star,
ID at the intersection of Hwy 44 and Bridger Bar Drive. Observations included joint trenching, safety
equipment,verification of OQs, install of 2" main. All procedures were followed in accordance with IGCs
Attachments
IPUC Form 4 Construction Inspections
Daily itenerary located in file for the project.
OQ's for all observed employees are located in file for the project.
Corrective Action Required: Yes No X
Follow-up Required: by (date): Yes No X
Inspector (Lead): Date:
10/26/2022
Brooks
Reviewer: `a Date:
10/26/2022
Galli
IPUC Form 1