Loading...
HomeMy WebLinkAboutIntermountain Gas 221026 Star 1 Construction Idaho PUC Pipeline Safety Inspection Summary Inspectors): I Brooks, Galli 11 Date(s): 26-Oct-22 Company/Owner: I Intermountain Gas Company(IGC) Unit#/OPID 18160 Inspection Type &Time (1 day, 0.5 day) Total Inspection Days: 2 Standard:FI Construction:F2 Training: (T)(D)Integrity Management: Incident: Gas Rule: F] Follow-up: Oct: Damage Prevention: D&A: Inspection Summary A construction inspection was performed on Probst Electric -Gas Division a contractor for Intermountain Gas Company. 26 October 2022 (2.0) construction,typed reports IPUC inspectors observed a Probst Electric crew install a plastic main line at new subdivision Cranefield in Star, ID at the intersection of Hwy 44 and Bridger Bar Drive. Observations included joint trenching, safety equipment,verification of OQs, install of 2" main. All procedures were followed in accordance with IGCs Attachments IPUC Form 4 Construction Inspections Daily itenerary located in file for the project. OQ's for all observed employees are located in file for the project. Corrective Action Required: Yes No X Follow-up Required: by (date): Yes No X Inspector (Lead): Date: 10/26/2022 Brooks Reviewer: `a Date: 10/26/2022 Galli IPUC Form 1