Loading...
HomeMy WebLinkAboutIntermountain Gas 221025 Star Construction Idaho PUC Pipeline Safety Inspection Summary Inspector(s): I Brooks, Galli I Date(s): 25-Oct-22 Company/Owner: I Intermountain Gas Company(IGC) Unit#/OPID 18160 Inspection Type &Time (1 day, 0.5 day) I Total Inspection Days: 1 Standard: Construction: F-1 I Training: r7 (T)(D) Integrity Management: El Incident: Gas Rule: Follow-up: OQ: Damage Prevention: D&A: Inspection Summary A construction inspection was performed on Das-Co, a contractor for Intermountain Gas Company. 25 October 2022 (1.0) construction,typed reports IPUC inspectors observed contractors(Das-Co) attempt to locate a 6" steel HP line at 10474 W State St in Star, ID. Observations included line locating,trenching, safety equipment, shore box installation and verification of OQs. Das-Co employee was quizzed on applicable AOCs. All procedures were followed in accordance with IGCs Operations and Maintenance Manual. Attachments IPUC Form 4 Construction Inspections Daily itenerary located in file for the project. OQ's for all observed employees are located in file for the project. Corrective Action Required: Yes No X Follow-up Required: by (date): Yes No X Inspector(Lead): Date: 10/25/2022 Brooks Reviewer: Date: 10/25/2022 Galli IPUC Form 1