Loading...
HomeMy WebLinkAboutIntermountain Gas 221024 Emmett Construction Idaho PUC Pipeline Safety Inspection Summary Inspectors): 113rooks, Galli I Date(s): 24-Oct-22 Company/Owner: I Intermountain Gas Company (IGC) Unit#/OPID 18160 Inspection Type &Time (1 day, 0.5 day) I Total Inspection Days:12 Standard:F-1 Construction:F2 Training: F__] (T)(D) Integrity Management: El Incident: E] Gas Rule: F] Follow-up: 71 oQ: Damage Prevention: D&A: Inspection Summary A construction inspection was performed on Das-Co, a contractor for Intermountain Gas Company. 24 October 2022 (2.0) construction,typed reports IPUC inspectors observed contractors (Das-Co) install a new 3/4" PE service line to a house at 2646 Laidlaw Drive in Emmett,ID. Observations included line locating, trenching,tracer wire,plastic butt fusions, successful pressure test at 90 psi for 15 minutes, EFV installations, line squeezing,bedding, and backfilling. Das-Co employee was quizzed on applicable AOCs for fusion and squeeze off procedures. All procedures were followed in accordance with IGCs Operations and Maintenance Manual. Attachments: IPUC Form 4 Construction Inspections Daily itenerary located in file for the project. OQ's for all observed employees are located in file for the project. Corrective Action Required: Yes No X Follow-up Required: by(date): Yes No X Inspector (Lead): Date: 10/24/2022 Brooks Reviewer: Date: 10/24/2022 Galli IPUC Form 1