HomeMy WebLinkAboutIntermountain Gas 221018 Middleton Construction Idaho PUC Pipeline Safety Inspection Summary
Inspectors): JBrooks I Date(s): 18-Oct-22
Company/Owner: Intermountain Gas Company Unit#/OPID 18160
Inspection Type &Time (1 day, 0.5 day) I Total Inspection Days:11
Standard:F-] Construction:F71 Training: F-] (T)(D) Integrity Management: Incident:
Gas Rule: = Follow-up: OQ: Damage Prevention: D&A:
Inspection Summary
A construction inspection was performed on Das-Co, a contractor for Intermountain Gas Company.
18 October 2022 (1.0) construction,typed reports
IPUC inspector observed contractor crew (DasCo) install new 3/4" PE service lines for the house and shop at
625 Blue Lakes Ct., in Middleton, ID. Observations included line locating,trenching,tracer wire,plastic fusions,
pressure test, EFV installations, line squeezing,bedding, and backfilling. All procedures were followed.
Attachments:
IPUC Form 4 Construction Inspections
Daily itenerary located in file for the project.
OQ's for all observed employees are located in file for the project.
Corrective Action Required: Yes No X
Follow-up Required: by(date): Yes No X
Inspector (Lead): r Date:
Brooks 18-Oct-22
Reviewer: Date:
IPUC Form 1