Loading...
HomeMy WebLinkAboutIntermountain Gas 221013 Nampa Construction Idaho PUC Pipeline Safety Inspection Summary Inspectors): I Brooks I Date(s): 13-Oct-22 Company/Owner: Intermountain Gas Company Unit#/OPID 18160 Inspection Type&Time (1 day, 0.5 day) I Total Inspection Days:11 Standard:F-] Construction:F_11 Training: F-] (T)(D)Integrity Management: Incident: Gas Rule: = Follow-up: OQ: Damage Prevention: D&A: Inspection Summary A construction inspection was performed on Das-Co, a contractor for Intermountain Gas Company. 13 October 2022(1.0) construction,typed reports IPUC inspector observed contractor crew (DasCo)install new 3/4" PE service lines at 7506, 7520, and 7534 E Merganser Dr, in Nampa, ID. Observations included trenching,tracer wire, stab fittings,plastic fusions,pressure tests, leak tests, EFV installations, line squeezing,bedding, and backfilling. All procedures were followed. Attachments: IPUC Form 4 Construction Inspections Daily itenerary located in file for the project. OQ's for all observed employees are located in file for the project. Corrective Action Required: Yes No X Follow-up Required: by (date): Yes No 7 Inspector (Lead): Date: Brooks 13-Oct-22 Reviewer: Date: IPUC Form 1