HomeMy WebLinkAboutIntermountain Gas 221013 Nampa Construction Idaho PUC Pipeline Safety Inspection Summary
Inspectors): I Brooks I Date(s): 13-Oct-22
Company/Owner: Intermountain Gas Company Unit#/OPID 18160
Inspection Type&Time (1 day, 0.5 day) I Total Inspection Days:11
Standard:F-] Construction:F_11 Training: F-] (T)(D)Integrity Management: Incident:
Gas Rule: = Follow-up: OQ: Damage Prevention: D&A:
Inspection Summary
A construction inspection was performed on Das-Co, a contractor for Intermountain Gas Company.
13 October 2022(1.0) construction,typed reports
IPUC inspector observed contractor crew (DasCo)install new 3/4" PE service lines at 7506, 7520, and 7534 E
Merganser Dr, in Nampa, ID. Observations included trenching,tracer wire, stab fittings,plastic fusions,pressure
tests, leak tests, EFV installations, line squeezing,bedding, and backfilling. All procedures were followed.
Attachments:
IPUC Form 4 Construction Inspections
Daily itenerary located in file for the project.
OQ's for all observed employees are located in file for the project.
Corrective Action Required: Yes No X
Follow-up Required: by (date): Yes No 7
Inspector (Lead): Date:
Brooks 13-Oct-22
Reviewer: Date:
IPUC Form 1