Loading...
HomeMy WebLinkAboutIntermountain Gas 220929 Nampa 2 Construction Idaho PUC Pipeline Safety Inspection Summary Inspector(s): I Brooks Date(s): 29-Sep-22 Company/Owner: Intermountain Gas Company JUnit#/OPID 8160 Inspection Type &Time (1 day, 0.5 day) Total Inspection Days. 1 Standard:F-] Construction: FTI Training: F-] (T)(D)Integrity Management: EJ Incident: Gas Rule: = Follow-up: OQ: Damage Prevention: D&A: Inspection Summary A construction inspection was performed on Das Co -a contractor for Intermountain Gas Company. 29 September 2022 (1.0) construction,typed reports IPUC inspector observed contractor crew(DasCo) install a 3/4" PE service line at 14050 Hidalgo Ranch Pl, in Nampa, ID. Observations included trenching,tracer wire, stab fitting,plastic fusion, pressure test, leak test, EFV installations, line squeezing,bedding, and backfilling. All procedures were followed. Attachments IPUC Form 4 Construction Inspections Daily itenerary located in file for the project. OQ's for all observed employees are located in file for the project. Pictures of job ticket and other pertinent paperwork Corrective Action Required: Yes No X Follow-up Required: by(date): Yes No X Inspector (Lead): Ji Date: Brooks — 29-Sep-22 Reviewer: Date: IPUC Form 1