HomeMy WebLinkAboutIntermountain Gas 220929 Nampa 1 Construction Idaho PUC Pipeline Safety Inspection Summary
Inspectors): lPerkins, Galli I Date(s): 29-Sep-22
Company/Owner: I Intermountain Gas Company(IGC) Unit#/OPID 18160
Inspection Type &Time (1 day, 0.5 day) Total Inspection Days: 2
Standard: Construction:F2 Training: (T)(D) Integrity Management: Incident:
Gas Rule: Follow-up: OQ: Damage Prevention: D&A:
Inspection Summary
A construction inspection was performed on Das-co, a contractor for Intermountain Gas Company.
29 September 2022 (1.0) construction,typed reports
IPUC inspectors observed contractors installing a 4" PE main and 2" PE service line at 16680 Northside Blvd,
Nampa, Idaho. Job included trenching,boring,pullback,tracer wire and fusing. All procedures were followed in
accordance with IGC Operations and Maintenance Manual.
Attachments
IPUC Form 4 Construction Inspections
Das-Co daily iteneraries located in file for the project.
OQ's for all observed employees are located in file for the project.
Pictures of job ticket and other pertinent paperwork in file.
Corrective Action Required: Yes No X
Follow-up Required: by(date): Yes No X
Inspector(Lead): .� '^ Date:
Perkins ✓L, 29-Sep-22
Reviewer: Date:
Brooks
IPUC Form 1