HomeMy WebLinkAboutIntermountain Gas 220927 Star Construction Idaho PUC Pipeline Safety Inspection Summary
Inspectors): JBrooks I Date(s): 27-Sep-22
Company/Owner: lintermountain Gas Company Unit#/OPID 18160
Inspection Type &Time (1 day, 0.5 day) Total Inspection Days: 1
Standard:F-1 Construction: � Training: (T)(D) Integrity Management: Incident:
Gas Rule: = Follow-up: OQ: Damage Prevention: D&A:
Inspection Summary
A construction inspection was performed on Das Co-a contractor for Intermountain Gas Company.
27 September 2022 (1.0) construction,typed reports
IPUC inspector observed contractor crew (DasCo) install (4) 3/4"PE service lines at 2353, 2354, 2366 N Steel
Falls Ave and 11378 W Teratai St in Star, ID. Observations included trenching,tracer wire, stab fittings,plastic
fusions,pressure tests, leak tests, EFV installations, line squeezing,bedding, and backfilling. All procedures
were followed.
Attachments:
IPUC Form 4 Construction Inspections
Daily itenerary located in file for the project.
OQ's for all observed employees are located in file for the project.
Pictures of job ticket and other pertinent paperwork
Corrective Action Required: Yes No X
Follow-up Required: by (date): Yes No X
Inspector(Lead): Date:
Brooks 27-Sep-22
Reviewer: Date:
Perkins
IPUC Form 1