Loading...
HomeMy WebLinkAboutIntermountain Gas 220927 Star Construction Idaho PUC Pipeline Safety Inspection Summary Inspectors): JBrooks I Date(s): 27-Sep-22 Company/Owner: lintermountain Gas Company Unit#/OPID 18160 Inspection Type &Time (1 day, 0.5 day) Total Inspection Days: 1 Standard:F-1 Construction: � Training: (T)(D) Integrity Management: Incident: Gas Rule: = Follow-up: OQ: Damage Prevention: D&A: Inspection Summary A construction inspection was performed on Das Co-a contractor for Intermountain Gas Company. 27 September 2022 (1.0) construction,typed reports IPUC inspector observed contractor crew (DasCo) install (4) 3/4"PE service lines at 2353, 2354, 2366 N Steel Falls Ave and 11378 W Teratai St in Star, ID. Observations included trenching,tracer wire, stab fittings,plastic fusions,pressure tests, leak tests, EFV installations, line squeezing,bedding, and backfilling. All procedures were followed. Attachments: IPUC Form 4 Construction Inspections Daily itenerary located in file for the project. OQ's for all observed employees are located in file for the project. Pictures of job ticket and other pertinent paperwork Corrective Action Required: Yes No X Follow-up Required: by (date): Yes No X Inspector(Lead): Date: Brooks 27-Sep-22 Reviewer: Date: Perkins IPUC Form 1