HomeMy WebLinkAboutIntermountain Gas 220927 Nampa Construction Idaho PUC Pipeline Safety Inspection Summary Inspectors): Perkins/Galli I Date(s): I 1-Sep-22 Company/Owner: I Intermountain Gas Company Unit#/OPID 18160 Inspection Type &Time (1 day, 0.5 day) I Total Inspection Days:12 Standard:F—] Construction: F2 Training: F—] (T)(D)Integrity Management: Incident: Gas Rule: = Follow-up: OQ: Damage Prevention: D&A: Inspection Summary A construction inspection was performed on Nampa Intermountain Gas Company Crew 1 September 2022 (2.0) construction,typed reports IPUC inspectors observed the Nampa IGC Crew squeeze off, disconnect and fill with foam a 3/4" service line at 3314 Parkview Way,Nampa, Idaho after discovering the tenant was stealing natural gas by removing the meter and only utilizing a meter bar and regulator. Crew also disconnected and abandoned a 2" service at 1660 11 th Ave N building 12 in Nampa, Idaho due to the facility is being demolished. Observations included line locating, trenching, abandoning, stab fitting, met-fit caps, squeezing,bedding, and backfilling. All procedures were followed. Attachments IPUC Form 4 Construction Inspections Daily itenerary located in file for the project. OQ's for all observed employees are located in file for the project. Pictures of job ticket and other pertinent paperwork Corrective Action Required: Yes No X Follow-up Required: by(date): Yes No X Inspector (Lead): j.' �, / Date: Perkins 1-Sep-22 Reviewer: Date: �.�_� Brooks IPUC Form 1