HomeMy WebLinkAboutIntermountain Gas 220831 Mtn Home Construction Idaho PUC Pipeline Safety Inspection Summary
Inspector(s): Perkins/Galli I Date(s): 31-Aug-22
Company/Owner: I Intermountain Gas Company Unit#/OPID 18160
Inspection Type &Time (1 day, 0.5 day) I Total Inspection Days: 2
Standard:F—] Construction: F2 Training: r_—] (T)(D) Integrity Management: E= Incident:
Gas Rule: = Follow-up: OQ: Damage Prevention: D&A:
Inspection Summary
A construction inspection was performed on Boise Intermountain Gas Company Crew
IPUC inspectors observed Boise IGC Crew locating an unlocatable line at 1266 N Chukar Circle in Mt Home
Idaho utilizing digital line locater after attaching to next door house. Crew also installed a 1200 EFV as facility is
being remodeled into a laundry mat at 410 N 2nd E in Mt Home, Idaho. Observations included line locating,
trenching,purging, stab fitting,rewrapping steel line,pressure testing, bedding, and backfilling. All procedures
were followed.
Corrective Action Required: Yes No X
Follow-up Required: by (date): Yes No X
Inspector (Lead): Date:
Perkins %'� �� 31-Aug-22
Reviewer: Date: y
Brooks
IPUC Form 1