Loading...
HomeMy WebLinkAboutIntermountain Gas 220830 Meridian Construction Idaho PUC Pipeline Safety Inspection Summary Inspector(s): I Perkins, Galli I Date(s): 30-Aug-22 Company/Owner: I Intermountain Gas Company(IGC) Unit#/OPID 18160 Inspection Type &Time (1 day, 0.5 day) I Total Inspection Days: 2 Standard:F-] Construction: F2 Training: F-] (T)(D) Integrity Management: Incident: Gas Rule: F] Follow-up: OCt: Damage Prevention: D&A: Inspection Summary A construction inspection was performed on Das-co, a contractor for Intermountain Gas Company. 30 August 2022 (2.0)construction,typed reports IPUC inspectors observed contractors installing a 3/4" split service line to two residences at 3012 & 3024 E Parulo Dr,Meridian. Job included trenching, line locating,tracer wire,butt fusion, EFV 1200 installation, purging, stab fittings, squeeze off, successful pressure test at 90 PSI for 15 minutes, bedding(with sand) and backfill and CGI testing. Certified contractors were quizzed on applicable AOCs for fusion, squeeze off and pressure testing standards. All procedures were followed in accordance with IGC Operations and Maintenance Manual. Attachments IPUC Form 4 Construction Inspections Das-Co daily iteneraries located in file for the project. OQ's for all observed employees are located in file for the project. Pictures of job ticket and other pertinent paperwork Corrective Action Required: Yes No X Follow-up Required: by(date): , Yes No X Inspector (Lead): ' Date: Perkins 30-Aug-22 Reviewer: Date: IPUC Form 1