Loading...
HomeMy WebLinkAboutIntermountain Gas 220829 Kuna Construction Idaho PUC Pipeline Safety Inspection Summary Inspector(s): Perkins/Galli Date(s): 29-Aug-22 Company/Owner: llntermountain Gas Company Unit#/OPID 8160 Inspection Type &Time (1 day, 0.5 day) ITotal Inspection Days: 2 Standard:F-1 Construction:F2 Training: [7 (T)(D) Integrity Management: Incident: Gas Rule: = Follow-up: Oct: Damage Prevention: D&A: Inspection Summary A construction inspection was performed on Das-Co, a contractor for Intermountain Gas Company IPUC inspectors observed contractors installing a 3/4" service line at 1039 E Odyssey in Kuna Idaho. Job included line locating, trenching, tracer wire,butt fusion,purging,bedding and backfilling. 1936, 2098 and 2171 Thea Dr. did not have the sleeves buried deep enough to utilize. Additionally crew was sent out with jobs that had expired dig tickets. Corrective Action Required: Yes No X Follow-up Required: by (date): Yes No X Inspector (Lead): ;7 J' Date: Perkins 29-Aug-22 Reviewer: Date: Brooks IPUC Form 1