Loading...
HomeMy WebLinkAboutIntermountain Gas 220825 Boise Construction Idaho PUC Pipeline Safety Inspection Summary Inspector(s):I Perkins, Galli I Date(s): 8/25/2022 Company/Owner: I Intermountain Gas Company Unit/OPID: 108160 Inspection Type & Time 1 day, 0.5 day) Total Inspection Days:12.0 Standard:F-I Construction: 2.0 Training:r7 (T)(D)Integrity Management: ED Incident: Gas Rule:1-1 Follow-up: F-1 OQ: F7 Damage Prevention: E] D&A: E] Inspection Summary A construction inspection was performed on Das-co, a contractor for Intermountain Gas Company. 25 Ausust 22 (2.0) construction,typed reports IPUC inspectors observed contractors place a 3/4" service line at 3427 S West Point Ave and 3149 N Lancaster in Boise. Jobs include line locating,trenching,tracer wire, butt fusion,pressure test 90 psi for 15 minutes, purging, stab fitting, bedding and backfilling. IGC FOC Mingo on-site. All applicable procedures were followed. Attachments: IPUC Form 4 Construction Inspections Das-Co daily iteneraries located in file for the project. OQ's for all observed employees are located in file for the project. Pictures of job ticket and other pertinent paperwork Corrective Action Required: Yes I Nol X Follow-up Required: by(date): Yes No X Inspector (Lead):' ;% r'' Date: Perkins 8/25/2022 Reviewer: ,j Date: Brooks 7 IPUC Form 1