Loading...
HomeMy WebLinkAboutIntermountain Gas 220823 Boise Construction Idaho PUC Pipeline Safety Inspection Summary Inspector(s): IPerkins, Galli I Date(s): 23-Aug-22 Company/Owner: I Intermountain Gas Company(IGC) I Unit#/OPID 8160 Inspection Type &Time (1 day, 0.5 day) Total Inspection Days: 2 Standard:F-] Construction:F2 Training: F-] (T)(D) Integrity Management: Incident: Gas Rule: F] Follow-up: OQ: Damage Prevention: D&A: Inspection Summary A construction inspection was performed on Das-co, a contractor for Intermountain Gas Company. 23 Aug 2022 (2.0) construction, typed reports IPUC inspectors observed a Das-co crew install a 2" PE service and abandon a 1.25" PE service due to a newer building being built on top of the 1.25" gas line. The 2" service was connected to a 1.25" PE service line behind 8783 W Hackamore Dr,Boise, ID. Job included boring,tracer wire, installation of a 2" saddle onto Aldyl A,butt fusions, installation of 1800 EFV,purging,met-fitting a 2" to 1.25" slip coupling. IGC service techs were called to remove part of the meter set to conduct pressure testing. IGC FOC Joe Del Torre and Das-co Supervisor Austin Meyers were on-site.Das-co employees were quizzed on applicable AOCs regarding fusion and squeeze off procedures. All procedures were followed. Attachments: IPUC Form 4 Construction Inspections Das-Co daily iteneraries located in file for the project. OQ's for all observed employees are located in file for the project. Pictures of job ticket and other pertinent paperwork Corrective Action Required: Yes No X Follow-up Required: by(date): Yes No X Inspector (Lead): / Date: Perkins 8/23/2022 Reviewer: Date: Brooks 8/23/2022 IPUC Form 1