Loading...
HomeMy WebLinkAboutIntermountain Gas 220822 Boise Construction Idaho PUC Pipeline Safety Inspection Summary Inspector(s): I Perkins, Galli 11 Date(s): 22-Aug-22 Company/Owner: I Intermountain Gas Company (IGC) Unit#/OPID 18160 Inspection Type &Time (1 day, 0.5 day) Total Inspection Days:12 Standard:F-] Construction: F-2] Training: (T)(D)Integrity Management: Incident: Gas Rule: = Follow-up: OQ: Damage Prevention: D&A: Inspection Summary A construction inspection was performed on Das-co, a contractor for Intermountain Gas Company. 22 Aug 2022 (1.0) construction,typed reports IPUC inspectors observed a Das-co crew install a 3/4" PE service line from a 3/4" steel main to an existing residence at 1000 S Glen Haven Dr, Boise, ID that included line locating,trenching, tracer wire,butt fusions, installation of 1200 EFV,welded a 3/4" tapping T, ultrasonic wall thickness testing, successful pressure tests at 90 psi for 15 minutes. IGC FOC Mingo and Brody on-site.Das-co employees were quizzed on applicable AOCs regarding fusion procedures. All procedures were followed. Attachments: IPUC Form 4 Construction Inspections Das-Co daily iteneraries located in file for the project. OQ's for all observed employees are located in file for the project. Pictures of job ticket and other pertinent paperwork Corrective Action Required: Yes No X Follow-up Required: by(date) Yes No X Inspector(Lead): f; ,; Date: Perkins 8/22/2022 Reviewer: Date: Brooks 8/22/2022 IPUC Form 1