Inspection Summary
A construction inspection was performed on Das-co, a contractor for Intermountain Gas Company.
22 Aug 2022 (1.0) construction,typed reports
IPUC inspectors observed a Das-co crew install a 3/4" PE service line from a 3/4" steel main to an existing
residence at 1000 S Glen Haven Dr, Boise, ID that included line locating,trenching, tracer wire,butt fusions,
installation of 1200 EFV,welded a 3/4" tapping T, ultrasonic wall thickness testing, successful pressure tests at
90 psi for 15 minutes. IGC FOC Mingo and Brody on-site.Das-co employees were quizzed on applicable AOCs
regarding fusion procedures. All procedures were followed.
Attachments:
IPUC Form 4 Construction Inspections
Das-Co daily iteneraries located in file for the project.
OQ's for all observed employees are located in file for the project.
Pictures of job ticket and other pertinent paperwork
Corrective Action Required: Yes No X
Follow-up Required: by(date) Yes No X
Inspector(Lead): f; ,; Date:
Perkins 8/22/2022
Reviewer: Date:
Brooks 8/22/2022
IPUC Form 1