HomeMy WebLinkAboutIntermountain Gas 220815-18 Kuna Construction Idaho PUC Pipeline Safety Inspection Summary Inspector(s):I Perkins Date(s): 15-18 Aug 2022 Company/Owner: Intermountain Gas Company Unit/OPID: 08160 Inspection Type & Time 1 day, 0.5 day) Total Inspection Days 4.0 Standard:FI Construction: 4.0 Training:F-1 (T)(D)Integrity Management: E] Incident: El Gas Rule:F] Follow-up: F7 OQ: F-1 Damage Prevention: D&A: Inspection Summary A construction inspection was performed on Das-co, a contractor for Intermountain Gas Company. 15-18 August 22 (4.0) construction, typed reports IPUC inspector observed a Das-co crew installing met fits on 2ea 2" service lines. Crew tied the 2" service lines into 4" PE utilizing electrofusion 4"X2" saddle tees and connecting tracer wires. Observed crew installing cad welds on 6" steel lines for test posts and included coating and wrapping line. Das-co welders installed 6" steel to 4" PE transition tees, installed completion plugs, save-a-valves, performed line packs using nitrogen, pressure testing, blowdowns by installing vent stacks, cut/abandoned old 4" steel lines by purging and welded on caps/plugs. Cut and abandoned old high-pressure 2" lines by purging and filling lines with expandable foam. IGC crew performed line tapping on 2ea 6" lines. A different crew was bedding, backfilling, and cleaning up roadway. All procedures were followed. Attachments IPUC Form 4 Construction Inspections Das-Co daily iteneraries located in file for the project. OQ's for all observed employees are located in file for the project. Pictures of job ticket and other pertinent paperwork Corrective Action Required: Yes No X Follow-up Required: by(dale): Yes No X Inspector (Lead): � Date: Perkins G /�_ 9 Z Z Reviewer: Date: Brooks 7, IPUC Form 1