HomeMy WebLinkAboutIntermountain Gas 220808-11 Nampa Construction Idaho PUC Pipeline Safety Inspection Summary Inspector(s): I Perkins, Brooks and Galli I Date(s): 8-11 Aug 2022 Company/Owner: lintermountain Gas Company Unit/OPID: os16o Inspection Type &Time (1 day, 0.5 day) I Total Inspection Days: 6.0 Standard:FI Construction: 670 Training: F—] (T)(D) Integrity Management: EJ Incident: Gas Rule: F] Follow-up: OQ: Damage Prevention: D&A: Inspection Summary A construction inspection was performed on Das-co, a contractor for Intermountain Gas Company. 8-11 August 22 (6.0) construction,typed reports IPUC inspectors observed a Das-co crew installing%" service lines to four residences that included line locating, trenching, tracer wire, setting riser, backfilling, bedding,fusing, stab fittings, boring, potholing,jeeping 58' of 3/4" steel pipe, repairing anomolies and wrapping. Welded on 6"x 3/4" adapter, installed two HPSS's and pressure tested. 8' of the 6" steel line had damage to the coating and an IGC crew removed damaged coating and replaced with wax wrap. All procedures were followed. Attachments: IPUC Form 4 Construction Inspections Das-Co daily iteneraries located in file for the project. OQ's for all observed employees are located in file for the project. Pictures of job ticket and other pertinent paperwork Corrective Action Required: Yes No X Follow-up Required: by(date): Yes No X Inspector (Lead): =-`' y/�`:-' ' Date: Perkins " C r 8/12/2022 ,� ,. .Gi' �' Reviewer: Date: Brooks 8/12/2022 lit IPUC Form 1