HomeMy WebLinkAboutIntermountain Gas 220808-11 Nampa Construction Idaho PUC Pipeline Safety Inspection Summary
Inspector(s): I Perkins, Brooks and Galli I Date(s): 8-11 Aug 2022
Company/Owner: lintermountain Gas Company Unit/OPID: os16o
Inspection Type &Time (1 day, 0.5 day) I Total Inspection Days: 6.0
Standard:FI Construction: 670 Training: F—] (T)(D) Integrity Management: EJ Incident:
Gas Rule: F] Follow-up: OQ: Damage Prevention: D&A:
Inspection Summary
A construction inspection was performed on Das-co, a contractor for Intermountain Gas Company.
8-11 August 22 (6.0) construction,typed reports
IPUC inspectors observed a Das-co crew installing%" service lines to four residences that included line locating,
trenching, tracer wire, setting riser, backfilling, bedding,fusing, stab fittings, boring, potholing,jeeping 58' of
3/4" steel pipe, repairing anomolies and wrapping. Welded on 6"x 3/4" adapter, installed two HPSS's and
pressure tested. 8' of the 6" steel line had damage to the coating and an IGC crew removed damaged coating
and replaced with wax wrap. All procedures were followed.
Attachments:
IPUC Form 4 Construction Inspections
Das-Co daily iteneraries located in file for the project.
OQ's for all observed employees are located in file for the project.
Pictures of job ticket and other pertinent paperwork
Corrective Action Required: Yes No X
Follow-up Required: by(date): Yes No X
Inspector (Lead): =-`' y/�`:-' ' Date:
Perkins " C r 8/12/2022
,� ,. .Gi' �'
Reviewer: Date:
Brooks 8/12/2022
lit
IPUC Form 1