Loading...
HomeMy WebLinkAboutIntermountain Gas 220808 Nampa Construction Idaho PUC Pipeline Safety Inspection Summary Inspector(s): I Brooks, Galli I Date(s): 8-Aug-22 Company/Owner: JIntermountain Gas Company (IGC) Unit/OPID: 18160 Inspection Type &Time (1 day, 0.5 day) I Total Inspection Days: 2 Standard:F] Construction: F2 I Training: F__] (T)(D) Integrity Management: F-1 Incident: El Gas Rule: 71 Follow-up: F-1 OQ: F7 Damage Prevention: F-1 D&A: E] Inspection Summary A construction inspection was performed on Das-co, a contractor for Intermountain Gas Company. 8 Aug 2022(2.0) construction,typed reports IPUC inspectors observed a Das-co crew install a(3) 3/4" service lines to new residentials at 7463, 7477, 7491 E Mergenser Dr in Nampa, Idaho that included line locating,trenching,tracer wire, stab fittings, bedding/backfill, butt fusions, installation of 1200 EFV, successful pressure tests at 90 psi for 15 minutes and squeeze off procedures.Das-co employees were quizzed on applicable AOCs regarding fusion procedures and squeeze off times. All procedures were followed. Attachments: IPUC Form 4 Construction Inspections Das-Co daily iteneraries located in file for the project. OQ's for all observed employees are located in file for the project. Pictures of job ticket and other pertinent paperwork Corrective Action Required: Yes No X Follow-up Required: by(date): Yes No X Inspector (Lead): Date: Brooks 8/8/2022 Reviewer: Date: Brooks 8/8/2022 IPUC Form 1