Loading...
HomeMy WebLinkAboutIntermountain Gas 220803 Sugar City Construction Idaho PUC Pipeline Safety Inspection Summary Inspector(s): JPerkins Date(s): 8/3/2022 Company/Owner: Intermountain Gas Company Unit/OPID: 08160 Inspection Type &Time (1 day, 0.5 day) I Total Inspection Days: 1.0 Standard: Construction: 1.0 Training: F__] (T)(D) Integrity Management: Incident: Gas Rule: Follow-up: Oct: Damage Prevention: D&A: Inspection Summary A construction inspection was performed on Primoris, a contractor for Intermountain Gas Company. 3 August 22 (1.0) construction, typed reports IPUC inspector observed a Primoris crew installing 2" HDPE lines as part of a total Sugar City Aldyl replacement project. Crews were trenching,boring,pot holing,bedding,backfilling, and line locating. All procedures were followed. Attachments: IPUC Form 4 Construction Inspections OQ's for all observed employees are located in file for the project. Pictures of job ticket and other pertinent paperwork Corrective Action Required: Yes No X Follow-up Required: by(dat : Yes I No X Inspector(Lead): JDate: Perkins � 8/3/2022 Reviewer: Date: Brooks 7• IPUC Form 1