Loading...
HomeMy WebLinkAboutIntermountain Gas 220719 Star Construction Idaho PUC Pipeline Safety Inspection Summary Inspector(s): JPerkins I Date(s): 7/19/2022 Company/Owner: Intermountain Gas Company Unit/OPID: 108160 Inspection Type &Time (1 day, 0.5 day) Total Inspection Days:11.0 Standard: Construction: 1.0 Training: (T)(D) Integrity Management: Incident: Gas Rule: Follow-up: OQ: Damage Prevention: D&A: Inspection Summary A construction inspection was performed on Das-co, a contractor for Intermountain Gas Company. 19 Jul 22 (1.0) construction, typed reports IPUC inspector observed a Das-co crew install a 2" service line to a new business at 350 N Calhoun PI in Star, Idaho that included line locating,trenching,tracer wire,met fit and setting riser. All procedures were followed. Attachments: IPUC Form 4 Construction Inspections Das-Co daily iteneraries located in file for the project. OQ's for all observed employees are located in file for the project. Pictures of job ticket and other pertinent paperwork Corrective Action Required: Yes No X Follow-up Required: by(date): Yes No X Inspector (Lead): Date: Perkins � 7/19/2022 Reviewer: 7 Date: Brooks / 47 -� IPUC Form 1