Loading...
HomeMy WebLinkAboutIntermountain Gas 220718 Meridian Construction Idaho PUC Pipeline Safety Inspection Summary Inspector(s): JPerkins, Galli Date(s): 7/18/2022 Company/Owner: I Intermountain Gas Company Unit/OPID: 108160 Inspection Type&Time (1 day, 0.5 day) Total Inspection Days:11.0 Standard: Construction: 1.0 Training: (T)(D) Integrity Management: Incident: Gas Rule: Follow-up: OQ: Damage Prevention: D&A: Inspection Summary A construction inspection was performed on Das-co, a contractor for Intermountain Gas Company. 18 Jul 22 (1.0) construction, typed reports IPUC inspectors observed a Das-co crew install a 3/4" service line to 1315 W Santiago St, Meridian, ID that included line locating, trenching, installed a 1200 EFV, fusing, stab fitting, shading, successful pressure test at 90 psi for 15 minutes and bedding/backfill with sand. Das-co employees were quizzed on fusion and pressure test AOCs procedures. Attachments: IPUC Form 4 Construction Inspections Das-Co daily iteneraries located in file for the project. OQ's for all observed employees are located in file for the project. Pictures of job ticket and other pertinent paperwork Pictures of calibration stickers of all equipment used Corrective Action Required: Yes No X Follow-up Required: by(date : Yes No X Inspector (Lead): Date: Perki 1 7/18/2022 Reviewer: Date: Brooks IPUC Form 1