Loading...
HomeMy WebLinkAboutIntermountain Gas 220705 Boise Construction Idaho PUC Pipeline Safety Inspection Summary Inspector(s): lPerkins, Galli Date(s): 5-Ju1-22 Company/Owner: Intermountain Gas Company Unit/OPID: o816o Inspection Type &Time (1 day, 0.5 day) Total Inspection Days:12.0 Standard: Construction: 2.0 Training: (T)(D)Integrity Management: Incident: Gas Rule: Follow-up: OQ: Damage Prevention: D&A: Inspection Summary A construction inspection was performed on Das-co, a contractor for Intermountain Gas Company. 5 Jul 22 (2.0) construction, typed reports Observed a Das-co crew welding a tapping tee on 2" steel main in the road, traffic control,transition fitting, 2" PE main, boring and installing 3/4" service lines feeding 3 houses in culdesac, line locating,tracer wire install, fusing, met-fit couplings, pot-holing,trenching, and repairing a sewer line that boring crew hit. Locations were at 7200, 7130, 6720 and 6720 1/2 N Gary Lane, Boise ID. All procedures were followed. Attachments: IPUC Form 4 Construction Inspections Das-Co daily iteneraries located in file for the project. OQ's for all observed employees are located in file for the project. Pictures of job ticket and other pertinent paperwork Pictures of calibration stickers of all equipment used Corrective Action Required: Yes No X Follow-up Required: b (date):. , Yes No X Inspector (Lead): a;-'� ' Date: Perkins / /7 5 2022 Reviewer: ��� Date: ..7` Brooks IPUC Form 1