HomeMy WebLinkAboutIntermountain Gas 220630 Kuna Construction Idaho PUC Pipeline Safety Inspection Summary
Inspector(s): lPerkins, Galli I Date(s): 30-Jun-22
Company/Owner: lIntermountain Gas Company Unit/OPID: 08160
Inspection Type &Time (1 day, 0.5 day) Total Inspection Days: 2.0
Standard:F-] Construction: 2.0 Training: (T)(D) Integrity Management: Incident:
Gas Rule: = Follow-up: Oct: Damage Prevention: D&A:
Inspection Summary
A construction inspection was performed on Track Utilities, a contractor for Intermountain Gas Company.
30 Jun 22 (2.0) construction, typed reports
Observed a Track crew installing a new 2" PE main feeding a subdivision, installed bypass to keep feeding other
houses, blew pigs, utility line locating, excavating, bedding, tracer wire install, squeezing, stab fittings, met-fits
and testing gas percentage at 2102 N Sombrero Ave, Kuna ID. All procedures were followed.
Attachments:
IPUC Form 4 Construction Inspections
Track Utilities daily iteneraries located in file for the project.
OQ's for all observed employees are located in file for the project.
Pictures of job ticket and other pertinent paperwork
Corrective Action Required: Yes No X
Follow-up Required: by(date): Yes No X
Inspector (Lead): Date:
Perkins 6/30/2022
Reviewer: / Date:
Brooks 7'
IPUC Form 1