Loading...
HomeMy WebLinkAboutIntermountain Gas 220630 Kuna Construction Idaho PUC Pipeline Safety Inspection Summary Inspector(s): lPerkins, Galli I Date(s): 30-Jun-22 Company/Owner: lIntermountain Gas Company Unit/OPID: 08160 Inspection Type &Time (1 day, 0.5 day) Total Inspection Days: 2.0 Standard:F-] Construction: 2.0 Training: (T)(D) Integrity Management: Incident: Gas Rule: = Follow-up: Oct: Damage Prevention: D&A: Inspection Summary A construction inspection was performed on Track Utilities, a contractor for Intermountain Gas Company. 30 Jun 22 (2.0) construction, typed reports Observed a Track crew installing a new 2" PE main feeding a subdivision, installed bypass to keep feeding other houses, blew pigs, utility line locating, excavating, bedding, tracer wire install, squeezing, stab fittings, met-fits and testing gas percentage at 2102 N Sombrero Ave, Kuna ID. All procedures were followed. Attachments: IPUC Form 4 Construction Inspections Track Utilities daily iteneraries located in file for the project. OQ's for all observed employees are located in file for the project. Pictures of job ticket and other pertinent paperwork Corrective Action Required: Yes No X Follow-up Required: by(date): Yes No X Inspector (Lead): Date: Perkins 6/30/2022 Reviewer: / Date: Brooks 7' IPUC Form 1