HomeMy WebLinkAboutIntermountain Gas 220629 Kuna Construction Idaho PUC Pipeline Safety Inspection Summary
Inspector(s): I Perkins, Galli I Date(s): 29-Jun-22
Company/Owner: I Intermountain Gas Company Unit/OPID: 08160
Inspection Type &Time (1 day, 0.5 day) I Total Inspection Days:11.0
Standard:F-] Construction: 1.0 Training: F__1 (T)(D) Integrity Management: a Incident: El
Gas Rule: F] Follow-up: F-1 OQ: F-1 Damage Prevention: E] D&A:
Inspection Summary
A construction inspection was performed on Das-Co Utilities, a contractor for Intermountain Gas Company.
29 Jun 22 (1.0) construction, typed reports
Observed a Das-co crew installing a new W PE service line off W cap and go, quizzed employee on recognition
of AOC's of fusion and squeeze off procedures, observed utility line locating, excavating, bedding, shading,
tracer wire install and fusing at 1475 W Firehouse Lane, Kuna ID. All procedures were followed.
Attachments:
IPUC Form 4 Construction Inspections
Das-co Utilities daily iteneraries located in file for the project.
OQ's for all observed employees are located in file for the project.
Pictures of job ticket.
Corrective Action Required: Yes No X
Follow-up Required: by(date): Yes No X
Inspector (Lead): Date:
Perkins Lam' 6/29/2022
Reviewer: Date:
Brooks 6/29/2022
IPUC Form 1