Loading...
HomeMy WebLinkAboutIntermountain Gas 220629 Kuna Construction Idaho PUC Pipeline Safety Inspection Summary Inspector(s): I Perkins, Galli I Date(s): 29-Jun-22 Company/Owner: I Intermountain Gas Company Unit/OPID: 08160 Inspection Type &Time (1 day, 0.5 day) I Total Inspection Days:11.0 Standard:F-] Construction: 1.0 Training: F__1 (T)(D) Integrity Management: a Incident: El Gas Rule: F] Follow-up: F-1 OQ: F-1 Damage Prevention: E] D&A: Inspection Summary A construction inspection was performed on Das-Co Utilities, a contractor for Intermountain Gas Company. 29 Jun 22 (1.0) construction, typed reports Observed a Das-co crew installing a new W PE service line off W cap and go, quizzed employee on recognition of AOC's of fusion and squeeze off procedures, observed utility line locating, excavating, bedding, shading, tracer wire install and fusing at 1475 W Firehouse Lane, Kuna ID. All procedures were followed. Attachments: IPUC Form 4 Construction Inspections Das-co Utilities daily iteneraries located in file for the project. OQ's for all observed employees are located in file for the project. Pictures of job ticket. Corrective Action Required: Yes No X Follow-up Required: by(date): Yes No X Inspector (Lead): Date: Perkins Lam' 6/29/2022 Reviewer: Date: Brooks 6/29/2022 IPUC Form 1