Loading...
HomeMy WebLinkAboutIntermountain Gas 220628 Kuna Construction Idaho PUC Pipeline Safety Inspection Summary Inspector(s): Perkins,Galli Date(s): 28-Jun-22 Company/Owner: Intermountain Gas Unit/OPID: 8160 Inspection Type &Time (1 day, 0.5 day) Total Inspection Days: 2 Standard:F—] Construction:F2 Training: (T)(D) Integrity Management: Incident: a M/M: = Follow-up: Oct: Damage Prevention: D&A: Inspection Summary A construction inspection was performed on Das-co Utilities, a contractor for Intermountain Gas Company 28 Jun 22 (2.0) construction, typed reports Observed a Das-co crew installing a new W PE service line off 4" main with bolt on tee, quizzed employee on recognition of AOC's on tee, observed utility line locating, excavating, bedding, shading, tracer wire install, pressure testing and fusing at 1097 N Jacksonmill Ave, Kuna ID. All procedures were followed. Attachments: IPUC Form 4 Construction Inspections Das-co Utilities daily iteneraries located in file for the project. OQ's for all observed employees are located in file for the project. Pictures of job ticket. Corrective Action Required: Yes No X Follow-up Required: by (date): Yes No X Inspector (Lead): Date: Bruce Perkins ��/ C ,�- 28-Jun-22 Reviewer: Date: Jeff Brooks 7- ly• IPUC Form 1