Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Intermountain Gas 220615 Rupert Construction
Idaho PUC Pipeline Safety Inspection Summary Inspector(s): Perkins/Brooks/Galli Date(s): 16-Jun-22 Company/Owner: IGC Unit/OPID: 8160 Inspection Type&Time (1 day, 0.5 day) I Total Inspection Days: 1.5 Standard:FI Construction: 1.5 Training: (T)(D) Integrity Management: Incident: M/M: = Follow-up: OQ: Damage Prevention: D&A: Inspection Summary Observed KV Utilities crew installing 2" PE main to new subdivision in Rupert, Idaho. Crew ran tracer wire, fused and shaded pipe. Corrective Action Required: Yes No X Follow-up Required: by (date): Yes No X Inspector(Lead): Date: Perkins 16-Jun-22 Reviewer: Date: Brooks 16-Jun-22 fit IPUC Form 1