Loading...
HomeMy WebLinkAboutIntermountain Gas 220615 Rupert Construction Idaho PUC Pipeline Safety Inspection Summary Inspector(s): Perkins/Brooks/Galli Date(s): 16-Jun-22 Company/Owner: IGC Unit/OPID: 8160 Inspection Type&Time (1 day, 0.5 day) I Total Inspection Days: 1.5 Standard:FI Construction: 1.5 Training: (T)(D) Integrity Management: Incident: M/M: = Follow-up: OQ: Damage Prevention: D&A: Inspection Summary Observed KV Utilities crew installing 2" PE main to new subdivision in Rupert, Idaho. Crew ran tracer wire, fused and shaded pipe. Corrective Action Required: Yes No X Follow-up Required: by (date): Yes No X Inspector(Lead): Date: Perkins 16-Jun-22 Reviewer: Date: Brooks 16-Jun-22 fit IPUC Form 1