HomeMy WebLinkAboutIntermountain Gas 220425-28 Meridian Construction Idaho PUC Pipeline Safety Inspection Summary
Inspector(s): Perkins/Galli Date(s): 4/25-4/28
Company/Owner: I Intermountain Gas Unit/OPID: 18160
Inspection Type &Time (1 day, 0.5 day) Total Inspection Days: 8.5
Standard:F-] Construction: F-8] Training: F__] (T)(D) Integrity Management: El Incident: a
Gas Rule: F-1 Follow-up: 0.5 OQ: F-1 Damage Prevention: E::] D&A: E]
Inspection Summary
A construction inspection was preformed on Das-Co Utilities, a contractor for Intermountain Gas Company.
25-28 Apr 22 (8.0) construction,typed reports
Observed a crew installing a new 2" PE main, excavation, utility locating,bedding, fusing,tracer wire and met-fit
couplings, 2" Aldyl-A abandonment, EFV installation in the alleyway behind Albertsons at 68E Fairview Ave,
Meridian Idaho. NOPV was issued due to using a digital pyrometer that was out of calibration during fusing
operations. Squeezed off 2" aldyl-a main and connected to 2" PE main. Pressure tested and connected 3 -3/4"
service lines with EFVs (gauge was calibrated on 10/26/2021).
Corrective Action Required: Yes X No
Follow-up Required: by(date 10 Jun 2022 Yes X No
Inspector (Lead): Perkins Date: 4/28/2022
Reviewer: Brooks Date:
IPUC Form 1