HomeMy WebLinkAboutIntermountain Gas 220421 Boise Construction Idaho PUC Pipeline Safety Inspection Summary
Inspector(s): I Perkins/Galli I Date(s): 21-Apr-22
Company/Owner: Intermountain Gas Unit/OPID: 1 8160
Inspection Type &Time (1 day, 0.5 day) Total Inspection Days: 2
Standard: Construction: F2 Training: F7 (T)(D) Integrity Management: Incident:
M/M: Follow-up: Oct: Damage Prevention: D&A:
Inspection Summary
A construction inspection was performed on Das-co Utilities, a contractor for Intermountain Gas Company
21 Apr 22 (2.0) construction, typed reports
Observed a Das-co crew installing a new%" PE service line off 3" main, utility line locating, excavating, boring,
bedding, shading and tracer wire at 117 W Highland View, Boise ID. All procedures were followed.
Attachments:
IPUC Form 4 Construction Inspections
Das-co Utilities daily iteneraries located in file for the project.
OQ's for all observed employees are located in file for the project.
Pictures of job ticket.
Corrective Action Required: Yes No X
Follow-up Required: by(date): Yes No X
Inspector (Lead): Date:
Bruce Perkins 21-Apr-22
Reviewer: Date:
Jeff Brooks
IPUC Form 1