Loading...
HomeMy WebLinkAboutIntermountain Gas 220421 Boise Construction Idaho PUC Pipeline Safety Inspection Summary Inspector(s): I Perkins/Galli I Date(s): 21-Apr-22 Company/Owner: Intermountain Gas Unit/OPID: 1 8160 Inspection Type &Time (1 day, 0.5 day) Total Inspection Days: 2 Standard: Construction: F2 Training: F7 (T)(D) Integrity Management: Incident: M/M: Follow-up: Oct: Damage Prevention: D&A: Inspection Summary A construction inspection was performed on Das-co Utilities, a contractor for Intermountain Gas Company 21 Apr 22 (2.0) construction, typed reports Observed a Das-co crew installing a new%" PE service line off 3" main, utility line locating, excavating, boring, bedding, shading and tracer wire at 117 W Highland View, Boise ID. All procedures were followed. Attachments: IPUC Form 4 Construction Inspections Das-co Utilities daily iteneraries located in file for the project. OQ's for all observed employees are located in file for the project. Pictures of job ticket. Corrective Action Required: Yes No X Follow-up Required: by(date): Yes No X Inspector (Lead): Date: Bruce Perkins 21-Apr-22 Reviewer: Date: Jeff Brooks IPUC Form 1