Loading...
HomeMy WebLinkAboutIntermountain Gas 220413 Meridian Construction Idaho PUC Pipeline Safety Inspection Summary Inspector(s): Perkins Date(s): 13-Apr-22 Company/Owner: Intermountain Gas Unit/OPID: 1 8160 Inspection Type&Time (1 day, 0.5 day) Total Inspection Days:1 1 Standard: Construction:� Training: (T)(D) Integrity Management: Incident: M/M: Follow-up: Oct: Damage Prevention: D&A: Inspection Summary A construction inspection was performed on Das-co Utilities, a contractor for Intermountain Gas Company 13 Apr 22 (1.0) construction,typed reports Observed a Das-co crew installing a new W PE service line off 2" main with bolt on tee, quizzed new employee on recognition of AOC's on tee, utility line locating, excavating, bedding, shading and tracer wire at 1724 E Franklin Rd, Meridian ID. All procedures were followed. Attachments: IPUC Form 4 Construction Inspections Das-co Utilities daily iteneraries located in file for the project. OQ's for all observed employees are located in file for the project. Pictures of job ticket. Corrective Action Required: Yes No X Follow-up Required: by(date): Yes No X Inspector (Lead): , Date: Bruce Perkins 13-Apr-22 Reviewer: �' Date: Jeff Brooks - '�•13 IPUC Form 1