Loading...
HomeMy WebLinkAboutIntermountain Gas 220310 Star Construction Idaho PUC Pipeline Safety Inspection Summary Inspector(s): Perkins Date(s): 10-Mar-22 Company/Owner: Intermountain Gas Unit/OPID: 1 8160 Inspection Type &Time (1 day, 0.5 day) Total Inspection Days:1 1 Standard: Construction:a1 Training: (T)(D) Integrity Management: Incident: M/M: Follow-up: OQ: Damage Prevention: D&A: Inspection Summary A construction inspection was performed on Das-co Utilities, a contractor for Intermountain Gas Company 10 Mar 22 (1.0) construction,typed reports Observed a Das-co crew installing a new W PE service line, utility line locating, excavating, bedding, shading, tracer wire and pressure testing at 11557 W Soaring Hawk Ct, Star ID. AIIā€¢procedures were followed. Attachments: IPUC Form 4 Construction Inspections Das-co Utilities daily iteneraries located in file for the project. OQ's for all observed employees are located in file for the project. Pictures of job ticket. Corrective Action Required: Yes No X Follow-up Required: by(date): Yes No X Inspector (Lead): Date: Bruce Perkins ] 10-Mar-22 Reviewer: Date: Jeff Brooks IPUC Form 1