HomeMy WebLinkAboutIntermountain Gas 220309 Boise Construction Idaho PUC Pipeline Safety Inspection Summary
Inspector(s): I Perkins/Brooks I Date(s): 9-Mar-22
Company/Owner: Intermountain Gas Unit/OPID: 1 8160
Inspection Type &Time (1 day, 0.5 day) I Total Inspection Days:1 2
Standard:1-1 Construction: 72 Training: F__] (T)(D) Integrity Management: E::] Incident: E]
M/M: F-1 Follow-up: F7 oQ: F-1 Damage Prevention: D&A:
Inspection Summary
A construction inspection was performed on Das-co Utilities, a contractor for Intermountain Gas Company
9 Mar 22 (2.0) construction,typed reports
Observed a Das-co crews installing a new W PE service line, utility line locating, excavating, boring, bedding,
shading,tracer wire and pressure testing at 1801 W Dora St, Boise ID. All procedures were followed.
Attachments:
IPUC Form 4 Construction Inspections
Das-co Utilities daily iteneraries located in file for the project.
OQ's for all observed employees are located in file for the project.
Pictures of job ticket.
Corrective Action Required: Yes No X
Follow-up Required: by(date): Yes No X
Inspector (Lead): Date:
Bruce Perkins 9-Mar-22
Reviewer: Date:
Jeff Brooks -a 1—