Loading...
HomeMy WebLinkAboutIntermountain Gas 220308 Boise Construction Idaho PUC Pipeline Safety Inspection Summary Inspector(s): I Perkins/Brooks I Date(s): 8-Mar-22 Company/Owner: Intermountain Gas Unit/OPID: 1 8160 Inspection Type&Time (1 day, 0.5 day) I Total Inspection Days:1 2 Standard:F—] Construction:F2 Training: F__] (T)(D)Integrity Management: E� Incident: EJ M/M: F-1 Follow-up: F-1 oQ: F1 Damage Prevention: D&A: Inspection Summary A construction inspection was performed on Das-co Utilities, a contractor for Intermountain Gas Company 8 Mar 22 (2.0) construction,typed reports Observed a Das-co crew line locating, installing W PE service lines, excavating, bedding, shading,tracer wire install and pressure testing and IGC service tech bagging the meter at 4774 W Castlebar Drive & 7722 N Gary Lane, Boise ID. All procedures were followed. Attachments: IPUC Form 4 Construction Inspections Das-co Utilities daily iteneraries located in file for the project. OQ's for all observed employees are located in file for the project. Pictures of job ticket. Corrective Action Required: Yes No X Follow-up Required: y(date): Yes No X Inspector (Lead): �, Date: Bruce Perkins � �`J .G 8-Mar-22 Reviewer: Date: Jeff Brooks L::::LL //- IPUC Form 1