HomeMy WebLinkAboutIntermountain Gas 220308 Boise Construction Idaho PUC Pipeline Safety Inspection Summary
Inspector(s): I Perkins/Brooks I Date(s): 8-Mar-22
Company/Owner: Intermountain Gas Unit/OPID: 1 8160
Inspection Type&Time (1 day, 0.5 day) I Total Inspection Days:1 2
Standard:F—] Construction:F2 Training: F__] (T)(D)Integrity Management: E� Incident: EJ
M/M: F-1 Follow-up: F-1 oQ: F1 Damage Prevention: D&A:
Inspection Summary
A construction inspection was performed on Das-co Utilities, a contractor for Intermountain Gas Company
8 Mar 22 (2.0) construction,typed reports
Observed a Das-co crew line locating, installing W PE service lines, excavating, bedding, shading,tracer wire
install and pressure testing and IGC service tech bagging the meter at 4774 W Castlebar Drive & 7722 N Gary
Lane, Boise ID. All procedures were followed.
Attachments:
IPUC Form 4 Construction Inspections
Das-co Utilities daily iteneraries located in file for the project.
OQ's for all observed employees are located in file for the project.
Pictures of job ticket.
Corrective Action Required: Yes No X
Follow-up Required: y(date): Yes No X
Inspector (Lead): �, Date:
Bruce Perkins � �`J .G 8-Mar-22
Reviewer: Date:
Jeff Brooks
L::::LL //-
IPUC Form 1