Loading...
HomeMy WebLinkAboutIntermountain Gas 220307 Caldwell Construction Idaho PUC Pipeline Safety Inspection Summary Inspector(s): Perkins Date(s): 7-Mar-22 Company/Owner: Intermountain Gas Unit/OPID: 1 8160 Inspection Type &Time (1 day, 0.5 day) Total Inspection Days: 0.5 Standard:FI Construction: 0.5 Training: F7 (T)(D) Integrity Management: F7 Incident: M/M: a Follow-up: F7 oQ: F-1 Damage Prevention: D&A: Inspection Summary A construction inspection was performed on Das-co Utilities, a contractor for Intermountain Gas Company 7 Mar 22 (0.5) construction, typed reports Observed a Das-co crews installing new 3/" PE service lines, excavating, bedding, shading, tracer wire and pressure testing at 19255/19261 Kiowa Creek, Nampa ID. When Das-co personnel squeezed the stub and went to purge the line they discovered the 2" perf saddle on both residences were not tapped. Exposed saddles and completed the tapping. All procedures were followed. Attachments: IPUC Form 4 Construction Inspections Das-co Utilities daily iteneraries located in file for the project. OQ's for all observed employees are located in file for the project. Pictures of job ticket. Corrective Action Required: Yes No X Follow-up Required: by(date): Yes No X Inspector (Lead): -, y- =' Date: Bruce Perkins �` � 7-Mar-22 Reviewer: Date: IN-1- IPUC Form 1